Our Quick Access Phone Numbers:
+90 (542) 666 11 11
+90 (533) 777 04 44
Mail : [email protected]
DRG MOTOR | Sales of High Efficiency Electric Motors
Our Quick Access Phone Numbers:
+90 (542) 666 11 11
+90 (533) 777 04 44
Mail : [email protected]
DRG MOTOR | Sales of High Efficiency Electric Motors

The fitting crew opens the input cover of the gearbox, brings the new motor up to it, and the shaft will not go into the bore. The flange outer diameter matches and all four holes ... More Details

The power goes off at the batching plant; the mixer drum is full of two cubic metres of fresh concrete and the lid is closed. Power returns twenty minutes later, the operator press... More Details

Halfway through a shift, a 37 kW rotary screw compressor trips on its overload relay, and on the second attempt there is a burning smell coming from the motor. The maintenance supe... More Details

In a recycling workshop, an operator drops a thick-walled crate fragment into the hopper; the granulator chokes for a moment, the belts squeal, and the motor stops on a thermal tri... More Details

The owner of a marble workshop calls and asks: "I need a 7.5 kW three-phase motor, what does it cost?" The question looks easy to answer, but the store lists more than one motor wi... More Details

At an olive oil plant, the motor on the malaxer has burned out and the rewinder says it cannot be rewound again. The maintenance technician removes it and puts it on the bench; hal... More Details